The list written while you still have leverage, two to three weeks before you sign.
A handover inspection is measured against your contract and selections, the Guide to Standards and Tolerances 2017, the National Construction Code and ABCB Housing Provisions, AS 3700 for masonry, AS 3740 for wet areas and AS 3000 for the electrical clearances noted.
0 checkpoints across 0 areas on a standard Edmondson Park pre-handover (PCI) inspection. We need the property accessible and, on a new build, the site supervisor aware an independent inspector is attending. Whatever is blocked on the day gets recorded as inaccessible, never as checked.
Photographed six kilometres north west, on the same kind of build in the same corridor.










New Construction Stage Inspections Seven checks through an Edmondson Park build, read against your engineering.
Defect Investigation Reports A single element, measured against the requirement behind it.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 on stock built since 2012.
Building and Pest Inspections Both reports from one attendance, on a suburb with nothing older than 2012. Instant online pricing, or talk to the booking team on 1300 471 805.
Because insulation packed against a fitting that needs an air gap is a fire risk. It is reported as a hazard rather than folded into the finish list, and it is corrected by an electrician or an insulation installer, not by us.
Yes, and the report gives the width rather than the adjective. Under five millimetres is usually within tolerance and is recorded so that a later reinspection can tell whether it moved.
Somewhere between two and three weeks ahead of your handover date. Later than that and the builder has no window to act, which turns a defect list into a settlement argument.