A weep hole required, at handover

The wrong stage to be finding it.

Owner Inspections · Edmondson Park 2174 · 2026-01-30

In short: A weep hole recorded as required at practical completion in Austral.

What a weep hole does

It drains the cavity. Water through the outer brick skin runs down, lands on a flashing and leaves through the weep hole. Remove any part of that and the water stays in the wall.

What was recorded

Weep hole required, at high severity, on an Austral practical completion inspection, together with a control joint not continuous on the same job.

Why handover is too late

At lock-up this is a bricklayer and a chisel. At handover the brickwork is finished, sometimes rendered, and correcting it means cutting into completed work.

How builders respond

They resist, for the reason above. The counter is a report that cites what the detail fails rather than describing how it looks, and a dated photograph.

The lesson for your build

Book lock-up. Every envelope item on this page belongs there, and every one of them was found months later.

Written by the Owner Inspections team from inspections carried out in Edmondson Park. Licensed building practitioners, NSW Fair Trading licence 366177C.

Guides

More pci / handover guides for Edmondson Park

All guides →

Book a building inspection in Edmondson Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Edmondson Park owners ask about this

Is this a major defect?

Of the categories argued as major, water through the envelope is the commonest. The argument is easier to have with the clause and the photograph in front of you.

How many weep holes should there be?

They are spaced along the base of the cavity and above openings at the intervals AS 3700 and the code require. A run with none is obvious; irregular spacing needs measuring.

What about the control joint?

Same principle. It has to run continuously through the height it was designed for, and a break in it is a crack waiting for a reason.

How long before handover should the booking go in?

Two to three weeks, so there is a genuine window for the builder to act.

CallGet a Free Quote