Edmondson Park Building
Inspections

Not enough bearing at the lintel

Bearing is a dimension, so the answer is arithmetic.

Owner Inspections · Edmondson Park 2174 · 2026-02-17

In short: Not enough bearing recorded at an external timber lintel in Austral.

What bearing means

The contact length a member has on its support. It is specified because load transfers through that contact, and less of it means higher stress in both the member and the support.

What was recorded

Not enough bearing at a timber external beam or lintel on an Austral frame inspection, alongside a splice in the roof framing and a bracket at an internal beam.

Why it belongs in an investigation

Because it is measurable. A builder can call a gap cosmetic; they cannot call a dimension something other than what it measures.

What the remedy looks like

Packing, a bracket, an additional support, or replacing the member. Which one is right is an engineer's call, and the report says so rather than guessing.

What we do not do

Nothing is opened up destructively, no engineering is certified, and no repair is designed. The report establishes the fact and names who resolves it.

Written by the Owner Inspections team from inspections carried out in Edmondson Park. Licensed building practitioners, NSW Fair Trading licence 366177C.

Guides

More defect reports guides for Edmondson Park

All guides →

Book a building inspection in Edmondson Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Edmondson Park owners ask about this

How do you measure it?

Against the specified bearing for that member on that support, taken from your engineering or from AS 1684 where the engineering is silent.

Could it have been like that on the drawing?

It happens. That is why the first step is reading the drawing rather than assuming the site is wrong.

Does an investigation take longer?

Narrower and deeper than a stage visit, and the report follows in a few business days rather than the same evening.

What should I send across?

The contract, your engineering, any earlier reports and your correspondence with the builder.

CallGet a Free Quote